Maxcell Innerduct
  • VOIR MAXCELL EN FRANÇAIS
  • VEA MAXCELL EN ESPAÑOL
  • VEJA MAXCELL EM PORTUGUÊS
  • About Us
  • Product Uses and Types
  • Who's Using MaxCell
  • Catalog
  • Customer Support
  • News and Initiatives
  • Contact Us

About Us

  • Learn About Maxcell Innerduct
  • Why Maxcell?
  • Videos
  • Applications
    • Overbuild
    • Curb to Building
    • Premise-Riser
    • Space Recovery / Renewal
    • Controlled Environmental Vaults (CEVs)
    • Right of Way Obstacles
    • Bridges
    • Terra Cotta & Multi-Concreted Duct Usage
    • Long Pulls - Minimize Splicing

Bridges

Problems

  • Limited conduit space
  • Limited space to maneuver equipment
  • Exposure to elements causes expansion & contraction of HDPE conduit & microducts

MaxCell Solution

  • MaxCell in overlay or new construction

General Benefits

  • MaxCell optimizes space with the existing conduit structure
  • Provides future pathways
  • Lower coefficient of expansion eliminates growth or contraction with temperature changes

© Copyright 2009 MaxCell Innderduct. All Rights Reserved.

600 Plum Creek Drive  |  Wadsworth, OH 44281  |  1-888-387-3828