Maxcell Innerduct
  • VOIR MAXCELL EN FRANÇAIS
  • VEA MAXCELL EN ESPAÑOL
  • VEJA MAXCELL EM PORTUGUÊS
  • About Us
  • Product Uses and Types
  • Who's Using MaxCell
  • Catalog
  • Customer Support
  • News and Initiatives
  • Contact Us

About Us

  • Learn About Maxcell Innerduct
  • Why Maxcell?
  • Videos
  • Applications
    • Overbuild
    • Curb to Building
    • Premise-Riser
    • Space Recovery / Renewal
    • Controlled Environmental Vaults (CEVs)
    • Right of Way Obstacles
    • Bridges
    • Terra Cotta & Multi-Concreted Duct Usage
    • Long Pulls - Minimize Splicing

Right of Way Obstacles

Problems

  • Railroad crossings require significant permitting cost & time (~$5000/permit)
  • Construction can inhibit traffic and create safety hazards for crew

MaxCell Solution

  • Overlay MaxCell and cable in existing conduit
  • "Piggyback" MaxCell & cable to save space

General Benefits

  • Saves permitting time and cost
  • Minimizes traffic disruption

© Copyright 2009 MaxCell Innderduct. All Rights Reserved.

600 Plum Creek Drive  |  Wadsworth, OH 44281  |  1-888-387-3828