Maxcell Innerduct
  • VOIR MAXCELL EN FRANÇAIS
  • VEA MAXCELL EN ESPAÑOL
  • VEJA MAXCELL EM PORTUGUÊS
  • About Us
  • Product Uses and Types
  • Who's Using MaxCell
  • Catalog
  • Customer Support
  • News and Initiatives
  • Contact Us

About Us

  • Learn About Maxcell Innerduct
  • Why Maxcell?
  • Videos
  • Applications
    • Overbuild
    • Curb to Building
    • Premise-Riser
    • Space Recovery / Renewal
    • Controlled Environmental Vaults (CEVs)
    • Right of Way Obstacles
    • Bridges
    • Terra Cotta & Multi-Concreted Duct Usage
    • Long Pulls - Minimize Splicing

Space Recovery / Renewal

Problems

  • Upgrade from copper to fiber can cause network downtime
  • Congested duct typically means copper must be removed prior to placing fiber
  • Single duct in outer duct is wasting space

MaxCell Solution

  • Overbuild with MaxCell and place fiber prior to removing copper
  • Pull out copper or duct & pull in MaxCell

General Benefits

  • Overbuilding allows service to remain intact until network switchover
  • Faster installation with MaxCell < 8 hours with crew of 4

© Copyright 2009 MaxCell Innderduct. All Rights Reserved.

600 Plum Creek Drive  |  Wadsworth, OH 44281  |  1-888-387-3828